langue fr LIEBHERR AEROSPACE - 10/11/2021

Liebherr - Drilling rig on the Grand Paris jobsite

VINCI and Liebherr meet 15 metres underground at Grand Paris Express. The French construction industry giant put their trust in Liebherr for the drilling of soldier piles for a ventilation unit on line 15, at the Arcueil-Cachan Station. Innovation and environment go hand in hand in this brand new version of the LB 16 unplugged, cable-free and battery-powered. In tune with Botte Fondations' ambitions as an environmental forerunner, the battery-powered LB 16 ensures a reduction in the carbon footprint and noise pollution, as well as an increase in cabin comfort while maintaining its electrical power. This cooperation bodes well for the future of this Franco-German partnership.

This video was taken in compliance with the locally applicable Corona guidelines.