langue fr LIEBHERR AEROSPACE - 07/12/2021

Liebherr LR 1700-1.0 powerful start

The new Liebherr LR 1700-1.0 crawler crane is gaining momentum. The first jobs deploying the state-of-the-art powerhouse from Ehingen have been completed with tremendous success. The 700-tonne crawler crane recently fulfilled the high expectations placed in it at its première in a wind farm near Paderborn. The local crane company Hofmann Kran-Vermietung GmbH & Co KG, a subsidiary of the Bracht Group, used the crane to erect a Nordex Delta 4000 wind turbine. The LR 1700-1.0 masterfully dealt with the prefabricated 96-metre high concrete tower for the turbine with a hub height of 164 metres. The heaviest components were the nacelle and drive train with gross loads of 72 and 75 tonnes.

This video was taken in compliance with the locally applicable Corona guidelines.